  • Planning of temporary, adaptive measures at the train station Arnstadt for the adaption of the to-be-installed ESTW to the track plan.
  • Numerous projects installing ATC (PZB) equipment.
  • The installation of intermittent deactivation capabilities on signal boxes.
  • The removal and reorganiziation i.e. rationalization of signal boxes.
  • From 1996 to 1998: tempory construction measures at the Nordhausen train station (7 interlocking districts), comprehensive changes to the safety technology installations, installing elektrical points an light signals, a total of 30 constructional phases.
  • Adaptive measures and various construction levels - renewal of the track superstructure system of the Unterwellenborn train station, setting up light signals and electrical points, a total of 16 constructional phases.
  • From 1997 to 2000: SPNV example route from Gotha to Leinefelde, adaption of multiple train stations to the track plans of the planned ESWT (conversion to EZMG technology).
  • Von 1997 bis 2000 SPNV-Musterstrecke Gotha-Leinefelde, Anpassung mehrerer Bahnhöfe an die Spurpläne des geplanten ESTW (Umbau in EZMG-Technik).
  • Construction measures on the ESTW-Eisenach.
  • Installation of a mobile signal at the Goseck block post (multiple building phases including plan inspection).
  • Plan inspection PT I/II of individual phases of construction at the Unterwellenborn train station.
  • Plan inspection ESTW-Saalfeld of construction steps 4 and 6-10 (in the construction forms GS II DR).
  • Plan inspection "ESTW-Enlargement Erfurt" - EAM Hopfgarten and EAM Vieselbach.
  • Plan inspection of multiple hardware sub-units/sub-structures of Alcatel's ESTW for Gotha-Leinefelde local route.
  • Camburg train station: project "Electricity-enabling and extension of the route Probszella - Saaleck" - planning of construction measures and steps and final condition PT II, PT III ( mechanical interlocking with light signals).
  • ICT-Linie 8, NeiTech: section Saaleck - Saalfeld station Camburg, Dornburg: Implementation planning PT II and PT III, all construction measures and steps.
  • ABS Karlsruhe-Stuttgart-Nürnberg-Dresden/Leipzig, Section Chemnitz Siegmar - Chemnitz Kappel: implementation planning PT I - PT III of all temporary construction measures and levels, and the final condition.
  • ABS Karlsruhe-Stuttgart-Nürnberg-Dresden/Leipzig, Section Flöha-Oederan: Interlocking with light signals.
  • 2001-04 NeiTech Erfurt-Würzburg, Project section 1 Neudietendorf(a) - Gräfenroda(e): comprehensive planning of all aspects of the project in cooperation with partner offices, during work phases 3-7, in line with the HOAI regulations: planning of a ESTW L90 including 14 rail-crossings, construction volume ca. €52 million.
  • ESTW Munich - Riem: Plan inspection of the connection "Neue Messe" (Neu Flair).
  • Sonneberger Network: Conceptualization of the signalling technology for a privately-owned railway, implementation planning, tendering, construction supervision. Construction volume about €6 million.
  • ESTW Munich - Riem: Plan inspection of the connection "Neue Messe" (Neu Flair).
  • 2002 - 2004: S-Bahn (City Train) Halle - Leipzig: Implementation planning for the adaption of the old signalling technology to the new track lines running over the new tunnel of Halle's main train station, in over 30 construction steps.
  • 2003 Blueprint planning of the signalling technology for ESTW Leinefelde expansion level III (Project halted).
  • 2001 - 2006: ABS Paderborn - Chemnitz, ESTW Gera: planning an ESTW EL S in the work phases 3 - 5 in the specific field of signalling technology, building volume approximately €47 million.
  • 2004 planning a safety system for the traffic-controlling operations on the route Eisfeld-Sonneberg, named "AZB".
  • Blueprint and implementation planning of different rail crossings in the context of complex route equipment installations.
  • From 1999 to 2004, the experts of our company issued approximately 550 inspection notices i.e. evaluations for the professional plan inspection of projects in line with the applicable government guidlines.
  • 2005 planning the axle counting installation at the station Neustadt/Orla.
  • 2005/2006 planning temporary construction measures at various train stations in relation to construction of the elektronic railway control centre.
  • 2005/2006 planning the AZB on the line Stollbert - St.Egiedien, client: Regio Infra Service Sachsen GmbH (RIS).
  • 2005/2006 planning the AZB on the line Weimar - Kranichfeld, client: DB Regio Südost.
  • 2007 planning the AZB on the line Straußfurt - Großheringen, client: Thüringer Eisenbahn GmbH (ThE).
  • 2009 planning the ESTW Bad Kissingen, Ebenhausen , client: DB Netze Süd.
  • 2009 planning the AZB on the line Eggenfelden - Neumarkt, client: Südostbayernbahn.
  • 2010 planning ACS2000 for Waldheim Station.
  • 2011 planning central signal box Guben Süd.
  • 2011 planning central signal box Bad Liebenwerda.
  • 2012 projects for PZB train control on many stations.